PRODUCTS


KUNCHENG CONTAINER
+
  • TJTP113.jpg

Analysis house

The Analysis house can also be called the on-site analyzer Analysis house.It is a closed structure where an analyzer is installed, and the operation and maintenance of the analyzer is carried out in the Analysis house.

Keywords:

Category:

WhatsApp / Wechat

+86-15333373195

Introduction

The Analysis house can also be called the on-site analyzer Analysis house.It is a closed structure where an analyzer is installed, and the operation and maintenance of the analyzer is carried out in the Analysis house.Since the online analyzer is installed on an industrial site, different degrees of climate and environmental protection are required to ensure the performance of the instrument and facilitate maintenance.The Analysis house was born as a result. It can meet the special environmental conditions required by the complete system of online analysis instruments, such as temperature, humidity, dust and explosion-proof, etc., and provides great convenience for the on-site installation, commissioning and maintenance of online analysis instruments.

Product process
The exterior wall panels use stainless steel, galvanized sheet and other related profiles and plates, and the flame-retardant thermal insulation materials are filled between the inner and outer walls and the inner and outer tops. The thickness of the thermal insulation layer is generally 70~75mm, and the materials are in line with the testing of relevant national institutions.When using galvanized steel plates, the surface must be sprayed, and the spraying color is white or international gray.

Executive standard

The production standards of the analytical cabin refer to and refer to the national standard GB3836.1-2010 "Explosive Environment Part 1: General Requirements for Equipment" GB3836.13-2013 "Explosive Environment Part 13: Equipment repair, Overhaul, Repair and Transformation"

GB3836.15-2000 "Electrical equipment for Explosive Gas Environments Part 15: Electrical installation in Hazardous Places (except Coal Mines)"
The relevant regulations of GB3836.17-2007 "Electrical Equipment for Explosive Gas Environments, Part 17, the structure and Use of Positive pressure Rooms or Buildings" require design and manufacturing.

When producing and Analysis house, national standards can also be matched according to the equipment configured in the Analysis house.

Advantage

Hebei Kuncheng Container Co., Ltd.

We are a container general contracting manufacturer integrating design, manufacturing,

transportation, installation and construction, and after-sales service.

Manufacturer strength


The production workshop is more than 3,000 square meters, and the annual production of more than 2,000 special containers.

Equipment quality


We have a complete container manufacturing process for the production line operation process.

Product quality


The company has passed ISO9001, ISO14001, ISO45001 certification, factory accreditation certificate, and inspection certificate.

Support customization


Accept non-standard customization of containers to ensure that every customer has a suitable product.

About us

Hebei Kuncheng Container Co., Ltd. is located in the Beijing-Tianjin-Hebei Integrated Economic Development Free Trade Zone. The company covers an area of 26,000 square meters, including a production workshop of more than 3,000 square meters.It has the general contracting and professional manufacturing capabilities of supporting services such as design, manufacturing, transportation, installation and construction, and after-sales service, and has the right to import and export foreign trade.The company produces more than 2,000 special containers annually.

The company mainly designs and produces special types of containers and standard containers.

Factory
Factory
Factory
Factory
Factory
Factory

Process flow

The manufacture of containers is a production line operation, and its process flow can be roughly divided into the following stages: 
1. Incoming inspection of raw materials, cutting, and surface treatment of steel (one-time sanding of steel plates, spraying of epoxy zinc-rich primer)
2. Folding plate, stamping and forming
3. Welding and assembly of components (front and rear frames, side panels, top panels, chassis), welding and assembly of the whole box
4. The whole box of slag cleaning and secondary sanding (after the secondary shot peening surface treatment, the weld area, the welding heat-affected area, and other surfaces that require secondary shot blasting, the roughness requirements reach BN9-BNl0 (Ry value 25µ-35µ), and the rust removal level reaches Sa2.Level 5 (approximately white iron shape), cleaning
5. Spraying (black primer spraying should be after the floor is installed), paint drying
6. Installation of spare parts (locks, air inlet blinds, breathable covers, etc.), beauty (spraying or labeling, nameplates, interior repairs), wind and rain density experiments, finished product inspection, warehousing

Process flow
Process flow
Process flow
Process flow
Process flow
Process flow
Process flow
Process flow
Process flow
Process flow
Process flow
Process flow

Our certificate

Factory accreditation certificate
Inspection certificate
Environmental management system certification
Occupational Health and Safety Management system certification
Quality management system certification

Previous:

Get Quote


*Contact us now, starting from the first communication!

Get Quote


*Contact us now, starting from the first communication!